HEATING SYSTEM REPLACEMENT FOR A FACILITY AT WISCONSIN | ANDHOLE ENG. LLC | MEP BIM
HEATING SYSTEM REPLACEMENT FOR A FACILITY AT WISCONSIN | ANDHOLE ENG. LLC | MEP BIM

Project Brief :
Replacement of existing inefficient heating boilers system with energy-efficient, variable temperature, modulating condensing heating boilers. The project included the replacement of pumps and piping systems and associated electrical and controls work. The new system was modelled in 3D CAD/Revit to ensure proper fit within the existing space and allow for adequate clearances for easy maintenance of all equipment.
Our Scope :
LOD 300 Model | Documentation |Coordination STR. Elements with AR.
Similar Projects

USA PROJECT | RAMANI | ARCHITECTURE BIM

DHE BUSINESS PARK

Deira Mall

Nakheel Mall