As built (LOD 500)

As built (LOD 500)

As-built documents are of vital importance to any project; however often those plans are only generated after the project is completed. As a result, many small changers or deviations from Construction Documents go unnoticed or are misinterpreted. Even worse, often as-built drawings are never created, leaving Construction Drawings the only source of documentation.

When engaged as monitoring and progress auditing team, BIMgrafX can provide accurate and complete as-built drawings with all changes made on site and not in accordance with the design. Handling and keeping all construction-related information in one BIM model allows us for unlimited flexibility for entering and changing even the smallest deviations from construction documents.

Advantages of having As-built 6D BIM models include capturing alterations from construction documents in an easily – accessible manner, being a source for future building maintenance and procurement planning and providing a snapshot of existing design.